Residential & Mixed-use
British School of Sofia
Category:
Office Building
Role in the Project:
Main Subcontractor – Architecture Part
Status:
Completed
Category:
Residential Building
Role in the Project:
Main Contractor – Architecture Part
Status:
Completed
Completion Date:
12.2020
Construction Period:
6 months
Investor:
STROY ALLIANCE INVEST
Client:
STROY ALLIANCE INVEST
Built-up Area:
3025 m²
Location:
Sofia, Bulgaria
Residential Park Lozen
Category:
Office Building
Role in the Project:
Main Subcontractor – Architecture Part
Status:
Completed
Category:
Closed Residential Complex
Role in the Project:
Subcontractor – Architecture Part
Status:
Ongoing Project
Completion Date:
01.12.2021
Construction Period:
10 months
Investor:
Lidner Immobilien Management
Client:
Bausystem
Location:
Sofia, Bulgaria
Crystal 116
Category:
Office building
Role in the project:
Main subcontractor – Architecture
Status:
Completed
Category:
Industrial building
Role in the project:
Main subcontractor – Architecture
Status:
Completed
Completion date:
10.2017
Construction period:
8 months
Investor:
Wirtgen Bulgaria
Client:
STRABAG EAD
Built-up area:
1 259 m²
Location:
Sofia / Krivina village
Atrium Residence
Teatralna Park Residence
Iris Park
Estera Building
Category:
Residential Building/Group, Office Building, Commercial Building
Role in the Project:
Main Subcontractor – Architecture
Status:
Completed
Completion Date:
1.12.2021
Execution Period:
10 months
Investor:
Estera 2018
Client:
UNISTROY HOLDING
Built-up Area:
17,033 m²
Location:
Sofia
GORA Complex
Category:
Office building
Role in the project:
Chief Subcontractor for Architecture
Status:
Completed
Completion Date:
1.11.2020.
Execution Period:
10 months
Investor:
BG Rei
Contracting Authority:
Pipe System
Built-up Area:
Office buildings – 17 582 m2