Residential Park Lozen

  • Category: Office Building
  • Role in the Project: Main Subcontractor – Architecture Part
  • Status: Completed
  • Category: Closed Residential Complex
  • Role in the Project: Subcontractor – Architecture Part
  • Status: Ongoing Project
  • Completion Date: 01.12.2021
  • Construction Period: 10 months
  • Investor: Lidner Immobilien Management
  • Client: Bausystem
  • Location: Sofia, Bulgaria

Description:
Residential Park Lozen is a gated residential complex located in the village of Lozen, just 12 minutes away from Sofia. The complex fulfills the urban dweller’s dream of a home that offers peace, comfort, high quality of life, and proximity to nature while remaining close to the city.

Construction of Phase 1 began in the summer of 2019 and includes 136 residential units comprising terraced houses, single-family houses, and semi-detached houses with various sizes and layouts. In addition to Phase 1, the construction of another 21 terraced and 6 semi-detached houses is planned. Phase 2 started at the beginning of 2021 and will expand the complex with an additional 41 terraced and 18 semi-detached houses.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.